Marino Building Project

For this project the client wished to have a second story added to his seaside home to capture the wonderful ocean views. The existing house consisted of a ground story and underground garage. The ground story had to be demolished down to the existing concrete slab after significant termite damage was discovered. The ground floor was rebuilt and second story added. A lift was installed to allow for easy access from garage to both floors of the house.

Interior design by Craig Hooper.